P-300 through P-399 Stormwater facility details | Standard Drawings & Details

 *Table Created 10-16-2020

















 Number Description Effective Date
 P-300 Concrete Inlet Type Metal 07-31-20
 P-301 Concrete Inlet Type Metal Rotated 07-31-20
 P-302 Concrete Inlet Type Metal Metal Inlet Assembly 07-31-20
 P-303 Concrete Inlet Type Metal with Channel and Grate (2.5 ft step-out) 07-31-20
 P-304 Concrete Inlet Type Metal with Channel and Grate (1 ft step-out) 07-31-20
 P-305 Concrete Inlet Type Metal with G-1 or G-2 Grate 07-31-20
 P-306 Curb Extension Notched Forebay 07-31-20
 P-307 Planter Walls 07-31-20
 P-308 Curb Extension Outlet Notch 07-31-20
 P-309 Beehive Inlet 07-31-20
 P-310 Overflow Slotted Drain 07-31-20
 P-331 Utility Coordination Sewer Service Requirements Under Green Street 07-31-20
 P-332 Utility Coordination Water Service Line Sleeving 07-31-20
 P-333 Utility Coordination Water Asset Clearances 07-31-20
 P-340 Linear Attachment and Pipe Boot 07-31-20

Source link

Advertisement

Be the first to comment

Leave a Reply